| A consultant deliverable reaches its recorded review milestone without a received file. |
Checks the permitted Google Drive folder and the project register, then drafts a Gmail reminder naming the requested document and the recorded milestone. It includes a link to the source request. |
The project architect checks the request and sends the consultant message. |
The register shows the missing item, its owner and the next approved follow-up instead of an unexplained overdue flag. |
| A revised drawing or schedule appears in the project folder. |
Records its file link and revision label as received, compares the register fields, and opens a review task. It leaves the earlier approved version identifiable. |
The responsible architect checks the revision and records whether it is accepted, rejected or needs clarification. |
Receipt stays separate from approval, and the project team can trace the decision to a specific file. |
| Meeting notes contain an action without an assigned owner or supporting document. |
Extracts a proposed action, links the note and marks the missing field. It prepares a short clarification request rather than inventing a deadline or assigning authority. |
The meeting chair confirms the owner, wording and milestone before the action enters the active register. |
The action list reflects an agreed responsibility, with unresolved details visible before reminders begin. |
| A weekly project review is approaching. |
Assembles the open consultant requests, revisions awaiting review and blocked approval tasks into a draft brief. Each item retains its source link and last recorded update. |
The project lead reviews the brief and decides which questions require the principal or the client. |
The review starts from an inspectable exception list instead of a fresh search through several inboxes. |
| A client update is requested while a design clarification remains open. |
Prepares an internal summary distinguishing the last confirmed decision from unanswered questions. It drafts possible wording without representing unresolved work as agreed. |
The architect responsible for the client relationship checks the facts and sends the final communication. |
The team can explain the current position without allowing an assistant to make a design commitment. |
| A task is marked complete without the evidence required by the project rules. |
Flags the missing sign-off or file reference and returns the item to an evidence-needed queue. It preserves the submitted update and the person who supplied it. |
The project manager resolves whether the evidence exists or the status needs correcting. |
A completed label is backed by the agreed record, while exceptions remain visible to the responsible person. |