| A selection row in an approved Buildertrend export remains open and its documented trade handoff is approaching review. |
Assemble the room, selection reference, schedule dependency, and latest authorized decision evidence. Present the exact missing field and prepare a question the coordinator can send through Gmail after review. |
The coordinator checks the selection and recipient, then sends the approved question. The homeowner confirms the choice and the project manager reviews any implications for scope or the signed schedule. |
The selection record names the outstanding decision and its owner. The downstream trade handoff remains visible until the required confirmation is recorded. |
| A coordinator finds two finish sheets in the authorized Google Drive project folder with different revisions for the same room. |
Show the available revision references alongside the current selection register. Flag the discrepancy and identify the trade packages connected to that room. |
The project manager identifies the governing revision. The coordinator checks permissions and uses the confirmed sheet when preparing any external handoff. |
The review queue shows the applicable revision and the specific handoffs that need a refreshed package or acknowledgment. |
| A subcontractor replies in Gmail that the selection package was received but one material detail remains unclear. |
Attach the reply to the related handoff and keep the specific unresolved detail visible. Prepare a short clarification with the revision reference and trade question for the coordinator. |
The project manager or designated specialist checks the clarification. A person sends it and records the response from the trade before the manager clears the dependency. |
The package receipt and remaining dependency have separate records, so the office can see the exact follow-up needed before the next decision. |
| A homeowner requests a product change that differs from a recorded selection in an authorized CoConstruct export or approved project register. |
Collect the request, existing approval, and documented downstream dependency for the project manager. Draft a neutral summary for the internal review queue with both revisions clearly labeled. |
The project manager approves change orders and schedule changes through the builder's process. The homeowner signs scope changes, and a designated person sends any approved communication. |
The team can review the proposed change against the signed record and trace which approval supports an eventual update. |
| The project manager opens a coordination review scheduled in Google Calendar and needs the unresolved selections for that project. |
Prepare a project brief organized by room, decision owner, and affected trade. Include links to authorized source records and highlight revisions that have changed since the last review. |
The manager checks the brief against the signed schedule, assigns unresolved items, and approves any schedule update separately. A person sends the resulting external messages. |
The team leaves the review with a named owner and evidence link for each open selection or trade dependency. |